One system of record for stage-gate delivery and compliance in regulated Hard FM.

Every stage carries a deliverables checklist. Every deliverable needs uploaded evidence. A gate can't close without a Sponsor's sign-off against that evidence — and compliance runs alongside delivery as a concurrent, config-driven module, not a separate spreadsheet nobody trusts.

Programme Dashboard
StageForge project dashboard showing gate activity, cost, and a full 8-gate timeline
Sign-off status Enforced by role

What StageForge Health does

Built for teams delivering hospital estates projects under real regulatory pressure — where inconsistent PM skill, complex overlapping regulations, and no shared system across projects is the actual, everyday problem.

1

A template library, not a blank page

Every project starts from a discipline-specific template — Boiler, UPS, Water Systems, Fire Detection and more — each mapped from real RIBA/SHTM/HTM-aligned source documents, so consistency doesn't depend on which PM happens to be running it.

2
Who has the final say

Compliance runs with delivery, not after it

Compliance items sit alongside the deliverables they belong to, with tiered override authority for anything carrying legal weight — a named specialist (Fire Officer, an Authorised Person, Clinical Safety Officer) is an exact-match requirement that even the SRO doesn't bypass.

3

Nothing closes without evidence and sign-off

A gate can't move forward without uploaded evidence and a Sponsor's sign-off against it — a real audit trail, not a status someone typed into a tracker. By Gate 4, a cost request is backed by real scope and quotes — not a guess made before the work was even understood.

4

A standing report, not a status chase

A weekly portfolio summary — every project's gate status, spend and outstanding risk — goes out by email automatically to whoever needs it. A Trust exec gets visibility without a login, a status meeting, or a PM building a deck, drawn live from the same data the team is already keeping current.

The problem isn't a lack of process — it's no control or consistency across projects, layered with complex regulation and variable PM skill. A template library that already encodes the right stages, deliverables and compliance checks is the answer.

Built for

Initial focus

Hard FM maintenance in hospitals — starting with a single NHS Scotland Trust programme, SHTM/HTM-aligned from day one.

Who it's for

FM Contractors and NHS Trust teams who both need visibility into the same live projects — with each side seeing only what their role allows.

Where it goes next

Built to re-skin for other regulated Hard FM sectors — defence, justice, transport — once the Health version is proven.

See it in action

A live project running through StageForge Health's cloud platform — from the portfolio dashboard down to a single gate's evidence checklist, with every role's authority enforced, not just shown.

1

The whole programme

Start here — every project's stage-gate timeline, cost, and team on one screen.

Programme Dashboard
StageForge project dashboard showing gate activity, cost, and a full 8-gate timeline
Every project's full stage-gate timeline, cost, and team on one screen.
2

Zoom into one gate

Its dates, its discipline-specific checklist, and exactly what's holding it up.

Gate 1 — Preparation & Briefing
A gate's delivery checklist and compliance requirement, each item citing its SHTM or CDM 2015 source
Every deliverable and compliance item citing its own regulatory source — nothing generic.
Gate 4 — Technical Design
A gate's full technical design deliverables package, each item citing its SHTM or CDM 2015 source
A real discipline-specific checklist — every item citing its regulatory source.
Pre-Contract Hold Point
Gate deliverables requiring sign-off from a Compliance Officer and a Senior Responsible Owner before the project can proceed
Hold points that actually hold, until the named authority signs off.
3

Compliance & regulatory mapping

What's configured underneath — override authority and jurisdiction-specific rules.

Compliance Rule Configuration
Compliance rule configuration showing override authority and required co-sign-off roles
Override authority and multi-party sign-off, configured per rule.
Regulatory Reference
Regulatory reference table mapping Scotland SHTM guidance to England HTM equivalents
Built once, mapped to every jurisdiction — Scotland (SHTM) and England (HTM) today.

Choose your deployment model

From single-user template exploration to full multi-party governance — same template library and project builder either way.

Single-user Desktop Preview

Explore the template library and standard workflows on your own machine — for trying the tool out, not for live multi-party delivery.

  • ✓ Full template library, same as Cloud
  • ✓ Runs entirely on your own machine — nothing leaves it
  • ✓ Shows every role's sign-off requirement
  • ✗ Multi-party enforced sign-off
  • ✗ Role-based access across teams
  • ✗ Shared audit trail across a live project
Get it on the Microsoft Store